HydraTech’s Videos
Rehabilitating Nearly Every Joint In Two Culverts
HYDRATITE CASE STUDY
Sept 15th, 2022
33 joints had degraded with age and required rehabilitation. The two culverts had their service life extended utilizing HydraTite seals. These seals eliminated infiltration at the joints and will help protect the above roadways from the formation of sinkholes. The entire process was completed in only 3 days with a small crew and limited tools.
Read The Related Case Study Here>
Explore HydraTite
More Media
All Videos
Explore HydraTite
More Media
All Videos
Explore HydraTite
More Media
Full Video Library